Ecobuild America
Sustainable, High Performance and Technology Solutions for the Built Environment
Washington Convention Center, Washington, DC
Conference and Meetings:
Monday, December 3 through
Friday, December 7
Friday, December 7
Exhibit - Hall D:
Wednesday, December 5
Noon – 5pm
Happy Hour Reception 4 - 5pm
Thursday, December 6
10am - 3pm
Noon – 5pm
Happy Hour Reception 4 - 5pm
Thursday, December 6
10am - 3pm
On Site Registration:
Tuesday, December 4
7am - 5pm
Wednesday, December 5
7am - 5pm
Thursday, December 6
7am – 3pm
7am - 5pm
Wednesday, December 5
7am - 5pm
Thursday, December 6
7am – 3pm
S207: Sustainability and Energy Efficiency for High Containment Government Labs
Speakers
Aaron Altman, Project Designer, HOK
Ken Brown, Lab Planning and Programming, HOK
Timothy O’Connell, Project Manager, HOK
Michael Walsh, Principal, R.G. Vanderweil Engineers, LLP
The DC CFL is the co-location of the District of Columbia?s: MPD Forensics Labs; Public Health Labs, including a BSL3 lab; and the Medical Examiner, including infectious and isolated autopsy suites. Even with this lab intensive project, the design team was able to achieve a 26% energy saving. Almost all of the labs, including the containment spaces have daylight and views to the outside. There is no storm water run-off, and over two million gallons of potable water will be saved annually with the storm water reclaim system.